One Step at a Time
 |
| Edmonds Landing Yard |
We've got the yard laid and wire drops in. With help from The Typesetter we're getting prepared for a afternoon of soldering. The main bus will be run along the front of the layout so it took two tries to the get the wire length right. But it's worth it and I'm glad I did. I watched a video on Model Railroad Academy and the double L bend helped a lot.
 |
| Marvin's Curve |
No comments:
Post a Comment